Construction Work up to 2007
|
|
|
Campbell Engine now in position outside museum entrance1434 viewsThe 40 ton Campbell has now been put back together as a gate guardian
|
|
Another delivery of concrete for the floors arrives1567 views
|
|
Trees down the drive need to be taken down to widen the area1927 views
|
|
Work on widening the drive and entrance area before new surface laid1623 views
|
|
Work on laying new surface on drive area1335 views
|
|
Outside shell goes up1444 views
|
|
New surface for drive entrance1446 views
|
|
Most of the buildings metal supports in place1359 views
|
|
Front wall brickwork going up1308 views
|
|
Blocks ready to be go in place1333 views
|
|
Work on bringing the steam engine building up to scratch1291 views
|
|
Front of steam engine building given a new look to match the new building1322 views
|
|
|