Construction Work up to 2007
|
|
|

Campbell Engine now in position outside museum entrance1467 viewsThe 40 ton Campbell has now been put back together as a gate guardian
|
|

Another delivery of concrete for the floors arrives1597 views
|
|

Trees down the drive need to be taken down to widen the area1958 views
|
|

Work on widening the drive and entrance area before new surface laid1663 views
|
|

Work on laying new surface on drive area1364 views
|
|

Outside shell goes up1480 views
|
|

New surface for drive entrance1480 views
|
|

Most of the buildings metal supports in place1385 views
|
|

Front wall brickwork going up1333 views
|
|

Blocks ready to be go in place1358 views
|
|

Work on bringing the steam engine building up to scratch1316 views
|
|

Front of steam engine building given a new look to match the new building1351 views
|
|
|