Anson Engine Museum
Anson Engine Museum Gallery
Home
Login
Anson Engine Museum
Album list
Last uploads
Last comments
Most viewed
Top rated
My Favorites
Search
Image search results - "anson museum building"
Preparing the foundations
1894 views
View between the main hall and the new Memorial Building
2807 views
Foundations being laid
1643 views
Almost finished
1633 views
Most of the brickwork is complete before doors and glass can be fitted
All ready to dig out the foundations
1592 views
The concrete for the floor had to be laid in sections
1636 views
The foundations being dug out
1617 views
Another section of concrete goes down
1648 views
Foundations for the back work being prepared
1594 views
The engine over the Stott steam engine can be seen in the background
Another delivery of concrete for the floors arrives
1662 views
Trees down the drive need to be taken down to widen the area
2021 views
Work on widening the drive and entrance area before new surface laid
1725 views
76 files on 7 page(s)
1
2
3
4
5
6
7