Wot - no shed, another job that needs doing. Note non-standard outrigger bearing.6946 views
Supplied 22/10/31 To The Famous ARP Studios Ealing6644 views600BHP @ 300RPM .Weight approx. 60Tons
15.5" bore 20" stroke
6631 viewsIt was used for for the studio lighting of such Classics as
Passport To Pimlico
Another Shore
Whiskey Galore
Kind Hearts and Coronets
To name just a few.
A nice photo exists of Miss Gracie Fields starting the engine.
Second lot of parts arrive at museum6471 viewsThese arrived at museum 11 October 2006
Engineers at college5985 viewsThe engineers at the college when the engine was installed in Oct 1967.
Photograph courtesy of Maurice Clyde
Second lot of parts arrive at museum5856 viewsThese arrived at museum 11 October 2006
Crank being fitted5802 viewsWhen the engine was installed at the Marine College in Oct 1967, crank being fitted.
Photograph courtesy of MauriceClyde
Next stage of the dismantling process5664 viewsTaken at the college w/c 2 Oct 2006.
Photograph courtesy of Maurice Clyde
Gardner 4L2 being admired5606 viewsVisitors admiring the Gardner 4L2 after it had received the EHHS plaque May 2005
Trailer split to unload the engine5313 views
Gardner 4T5 being prepared5180 viewsA crowd gathers to watch the Gardner 4T5 being warmed up and run. This impressive engine always draws a crowd of admirers.
Flywheel arriving at the museum 2nd April 20075103 viewsThe 25 ton flywheel can be seen as the lorry arrives in the museum drive